As seen from your determine down below, steady auger is used to drill the borehole, lift up drilled soil, and pour concrete when the auger is moved up. Therefore, the borehole would not have to have casing or hydrostatic force to prevent harm to the borehole wall. The withdrawn tube https://shanejozyx.total-blog.com/the-cast-in-situ-piles-in-bangladesh-diaries-57855553