1

How Oversite construction can Save You Time, Stress, and Money.

News Discuss 
All kerbs ought to be laid on the concrete bed of at the very least 100mm thickness, and haunched to thickness of no less than 150mm. Get ready the bed by using a trowel or spade so that it is close to 25mm very pleased, adding extra bedding if necessary. https://vivconstruct.com

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story